Aug 10, 2019     Shock Struts - (6 hours)       Category: Landing Gear
Assembled shock struts per Builder's Assistance Manual (BAM) and drawing # 28.
��eburred and polished inside of strut tube with emery cloth
��ubricated O-rings
��nstalled spring to shaft using bolt-socket method
As noted in BAM, installation of snap rings was a challenge


 